Today was not only a great day for a short paddle with my lovely wife, Cheryl, it was a chance to test a new work-around on my Bomar hatches and for Cheryl to test her new dry suit!!

The Bomar deck plates on the Black Pearl have always caused me grief when it comes to leakage. Off the shelf, they leaked like sieves, so I worked on the o-rings making the fit a bit tighter. This gave moderate satisfaction but there was always a significant amount of water entering the boat.


Ranger checking out the Bomars!

In April 2013, I tried the idea of bending the deck plates to give a snugger fit against the o-ring. I wrote up a blog entry on this and here is the link. This procedure gave the best results to date but the fit was always hit and miss, so sometimes the boat stayed dry while on others it leaked  - bad!!! 

I've always been on the lookout for materials that will give a better seal than the stock o-rings. Just prior to attending the annual kayaing retreat, I installed a larger-than-stock rubber tubing. I did not get a chance to test it until at the Retreat on our day paddle. When we stopped at lunch I had a hard time lifting the boat on the beach due the excess water in both the front and rear hatches!!! Luckily I had the stock gaskets in the boat so I dropped them back in over the lunch break and continued on.  I am guessing that the rubber tubing, which was supple while warm, became very hard when exposed to the cold water - we were paddling around an iceberg that day so you can imagine that the water was cold!! 

With the stock gaskets back in place, I was back to square one and still dealing with water in the hatches - sometimes so bad that it affected the handling of the boat!!  Time to revisit this issue!! I started by doing a new "bending of the Bomars" The problem with this is that the deck plates have a tendency to go back to their original shape after a time and the seal gets sloppier!!  

Fast forward to Friday June 5 and I was at a local Canadian Tire Store and, as per usual, I was looking for any kind of "gasket" material I could use on the Bomars!!  In the weatherstripping section I came upon a foam product that, I hoped, might work. It was only $5.00, so I took the plunge!!


Foam weatherstripping - 30' for $5.00.

As luck would have it, this stuff fit in the groove of the deck plates perfectly!!  Installation took all of one minute - no joking!!

Foam in place and ready for testing!

The deck plates fit nice and snug and the foam is soft enough not to distort the shape of the plate when clamped down - a very good sign. I did some testing by running water over the plate with a hose. Initial testing saw absolutely no water entering the boat. YES!!! So I moved onto the "standing water test" where water was kept on the deck plate for a length of time. Again, no leakage!!

The standing water test!! A PASS!!!

With "on land" testing a success, the next stage was sea trials.  This was to take place the following day when Cheryl and I decided to fit the water for a few hours on a lovely, sunny and warm Saturday afternoon!!

This was an opportunity for Cheryl to try out her latest gear purchase - a Kokatat dry suit (Gore-Tex) that she picked up earlier the week for a steal.  50% off a big ticket item like this does not come along every day, so when we found the suit, we jumped on it. I should point out that this is a brand new suit bought from a store that is a Kokatat dealer!! I feel compelled to also say that I also picked up a new Snap Dragon spray skirt for half price from the same store. Sweet, because I was looking for a replacement for my Seals Shocker which is a piece of crap!!!!!!!

Cheryl christening the new suit at St. Philip's!!

The Black Pearl pulled up on Lower Beach, Conception Bay!! Yes, that little white dot on the horizon is an iceberg.

So, how did the Bomars make out on the sea trials, you may ask? When I got off the water after 1.5 hours of paddling, there was not a drop of water in either the fore or aft hatches - for the first time EVER since this boat was launched over two years ago! Needless to say, I was a happy camper (paddler)!!  

AND HERE"S THE KICKER - when I got home and was taking the boat off the car, I looked at the deck near the rear hatch. It looked odd - like it wasn't flat or something.  I thought that maybe it was my mistake when building the boat but, I must admit, that I never noticed it before. Could it be that the deck was bowed upward from the air expanding inside the black hull in the direct sun???  I popped the deck plate and WHOOSH, air rushed out and the deck flattened out again!!   Now THAT was a tight seal!!!  Looks like we're good to go!!!  

There are still a few questions left to answered?  Will the foam last? Will it compress and lose its seal. To be honest, these are not troublesome questions. First off, the foam is dirt cheap and readily available. $5.00 will give me a slew of replacements. Second, it takes mere seconds to replace an o-ring - pop it in the groove and cut to length. A field repair is a joke and I will simply keep the package of extra foam in the boat at all times!!

I do believe that the Bomars have finally arrived!!!

Monday, May 12, 2014

Black Pearl Retrofit Project - Complete



On April 14, I made the first cut on this latest project. Exactly four weeks later, on May 12, the Black Pearl came out of drydock, i.e., the  attic and back into the light of day!

The most notable changes to the "updated" Black Pearl are a standard keyhole cockpit, a retractable skeg and a new, low luster paint job! Other, smaller, changes/additions include a revisited pump location and bow/stern grab loops. For all other intents and purposes, the Pearl is still the same craft!!

The plan is to take the Pearl to the pool tomorrow night for a test run and then, if all works out, we're off to the Paddle Newfoundland and Labrador Retreat this coming weekend. With the new cockpit and skeg, the Pearl  will be perfectly suited for day paddles!!

And here's a few snaps to show how things turned out



Finally, a chance to get a nice shot of the finished product!!

Finished product #2

Finished product #3.

Revisiting the "behind-the-back" pump location. See this link for a previous blog entry on this setup

Top view showing new cockpit layout.

Profile view of coaming and skeg control box. Still haven't decided what to do with the extra Maroske deck fittings left over!! Suggestions?

Stern view.

New grab loops made from rope and rubber tubing. Strong and comfortable.

Full view of deck!!

Bottom's up!!

And bottom's down!!!

Skeg looking cleaner than when first installed!

Just sitting pretty!!

Skeg (again)!

The Black is Back on the Rack!!! 

Back on the Rack #2

Well, it's been a fun-filled month but I am glad to have the project completed and the kayak back on the rack. Now, I am looking forward to some good paddling in the new and improved Black Pearl!!




Wednesday, May 7, 2014

The Black is Back (in the shop for some retrofitting)


My, but it's been a looong time since I've made a blog entry!! That's not to say that nothing has been happening, it's just that I've gotten too darn lazy!! But I digress. . .

The latest project involves the Black Pearl. That lovely black craft that exudes kayaking sexiness!! The boat was built with an ocean cockpit, i.e., small, oval and very hard to get into if you are in a hurry or have bad knees. I suffer from the latter. Not long after I built the boat I started to regret the ocean cockpit. It was fine in the pool or when launching from a nice ramp, but a bugger in dumping surf or a hard beach landing!!  But I was committed to the small cockpit because I spent over 150.00 dollars on a custom spray skirt!!! Fast forward to about 2 months ago!! I left said skirt at the pool and, lo and behold, it went missing!!  It never ever turned up. So now I had a boat with an ocean cockpit but lost my good skirt. I had an old one from before but I'll admit I was just looking for an excuse to get rid of the ocean cockpit. My left knee has really been acting up lately and I was having a real bear of a job actually just getting into the boat. These two excuses were enough to plant the seed for a new project - tearing out a perfectly good ocean cockpit coaming and replacing with a more standard keyhole configuration!!  Time to get cutting!!!  Oh, and while I am at, why not drop in a skeg for good measure??

Like I said, I am getting lazy so I will VERY heavily rely on images to tell this particular story!!



Here's the Pearl back in the dry dock awaiting work:

Let's cut that sucker off!!
No turning back now!!

Foam mold and new keyhole shape.

Profile shot.

Laying up the coaming. Took 8 layers of 6 oz cloth.


Make sure to trim after every few layers. Best done before the epoxy sets up hard!!


Roughed in. No sanding at this point!


Pumps on my epoxy crapped out so I went with scales, Very easy and VERY accurate ratio measurements.


All laid up.


Snow leopard pattern that magically appeared after sanding. I toyed with the idea of keeping it like this but opted to paint it black!!



Just hacking another hole for the skeg!!


Skeg slot in the VERY rough. Yes, I cleaned it up, and yes, the skeg fit in there perfectly. And YES, it is lined up with the centre line even though it does not look so in this picture!!

Test fitting the skeg.


Add cutting yet another hole. This time to provide access to the skeg.


Temporary skeg access hatch!


Skeg in place.


Adding a lip in the access hole.


Lip ready to go. Cut out piece in background ready to be dropped in.


A look at the final cockpit.


And another.


Skeg access hatch ready for painting!


Another hole for the skeg control box.


Skeg control box in place!

No evidence of back access hatch now. Gloss black replaced by flat black = a more menacing look, in my opinion!!